Proximity as a key factor to narrow the relationship between supplier and its customer – a case study in the auto industry

Main Article Content

Fabio Yukio Takeno
Wagner Cezar Lucato
Rosangela Maria Vanalle
Milton Vieira Júnior
صندلی اداری

Abstract

Themodern literature shows that the Just in Time (JIT) utilization in therelationship between client and its supplier aims at optimizing the flow in thesupply chain. Nevertheless, there are other aspects to be considered for thefull utilization of the lean supply practices. Among those, the proximity triesto improve the liaison between the client and its provider of materials andcomponents as a possible response to an increasing competitiveness level. Toexplore this subject this work had the objective of evaluating the determinantfactors that could possibly explain the partial relocation of a manufacturingfacility to create proximity conditions with one of its clients. For thatpurpose, a case study was developed in which a Brazilian auto partsmanufacturing company belonging to the first tier of the automotive supplychain was considered. As a result of such study, it was possible to concludethat the strategic advantages resulting from the proximity overpassed theconventional reasoning of considering financial gains as a key factor tojustify such a decision. In fact, the cost savings obtained with the plant relocationwere not enough to justify the investment made.

Downloads

Download data is not yet available.

Article Details

Section
Articles
Author Biographies

Fabio Yukio Takeno, Universidade Nove de Julho - São Paulo - SP - Brazil

MS candidate at the Industrial Engineering Post Graduation Program

Wagner Cezar Lucato, Universidade Nove de Julho - São Paulo - SP - Brazil

Professor and researcher at the Industrial Engineering Post Graduation Program.

Rosangela Maria Vanalle, Universidade Nove de Julho - São Paulo - SP - Brazil

Professor and researcher at the Industrial Engineering Post Graduation Program.

Milton Vieira Júnior, Universidade Nove de Julho - São Paulo - SP - Brazil

Professor and researcher at the Industrial Engineering Post Graduation Program.

References

AYMARD, P.; BRITO, E. (2009) Custos de mudança em serviços logísticos. Gestão e Produção, v. 16, n. 3, p. 466-478.

BENNETT, D.; KLUG, F. (2012) Logistics supplier integration in the automotive industry. International Journal of Operations & Production Management, v. 32, n. 11, p. 1281-1305.

CORRÊA, H. L.; GIANESI, G. N. (2012) Just in time, MRP II e OPT: um enfoque estratégico. São Paulo: Atlas.

GEBENNINI, E.; GAMBERINI, Y.; MANZINI, R. (2009) An integrated production-distribution model for the dynamic location and allocation problem with safety stock optimization. International Journal Production Economics, v. 122, p. 286-304.

GUARNIERI, P.; HATAKEYAMA, K. (2010) Formalização da logística de suprimentos: caso das montadoras e fornecedores da indústria automotiva brasileira. Produção, v. 20, n. 2, p. 186-199.

LEE, J.; LEE, Y. (2012) Facility location and scale decision problem with customer preference. Computers & Industrial Engineering, v. 63, p. 184-191.

MARCONI, M. A.; LAKATOS, E. M. (2010) Fundamentos de metodologia científica, 7th ed. São Paulo: Atlas.

MESQUITA, M.; CASTRO, R. (2008) Análise das práticas de planejamento e controle da produção em fornecedores da cadeia automotiva brasileira. Gestão e Produção, v. 15, n. 1, p. 33-42.

OMAR, M.; SARKER, R; OTHMAN, W. (2012) A just in time three level integrated manufacturing system for linearly time varying demand process. Applied Mathematical Modelling, v. 37, p. 1275-1281.

PACHECO, D.; JUNIOR, A.; ROCHA, E.; DORNELLES, P. (2012) Uma investigação sobre as implicações da logística enxuta: uma análise das percepções de clientes e fornecedores. In: ENEGEP – ENCONTRO NACIONAL DE ENGENHARIA DE PRODUÇÃO, 32, Bento Gonçalves, Proceedings... Rio de Janeiro: ABEPRO, 2012.

PATTON, M. Q. (1990) Qualitative evaluation and research methods. Newbury Park, CA: Sage.

REGO, J.; MESQUITA, M. (2011) Controle de estoque de peças de reposição: uma revisão da literatura. Produção, v. 21, n. 4, p. 645-655.

SALERMO, M. S. et al. (2001) Mapeamento da nova configuração da cadeia automotiva brasileira. Departamento de Engenharia de Produção da Escola Politécnica da Universidade de São Paulo. São Paulo: EDUSP.

SANTORO, M.; FREIRE, G. (2008) Análise comparativa entre modelos de estoques. Produção, v. 18, n. 1, p. 89-98.

TONTINI, G.; ZANCHETT, R. (2010) Atributos de satisfação e lealdade em serviços logísticos. Gestão e Produção, v. 17, n. 4, p. 801-816.

VANALLE, R. M.; SALLES, J. A. A. (2011) Relação entre montadoras e fornecedores: modelos teóricos e estudos de caso na indústria automobilística brasileira. Gestão e Produção, v. 18, n. 2, p. 237-250.

YIN, R. K. (2009) Case study research: design and methods, 4th ed. Newbury Park, CA: Sage.

فروشگاه اینترنتی