An overview of the advanced planning and scheduling systems

Main Article Content

Thales Botelho de Sousa
Carlos Eduardo Soares Camparotti
Fábio Müller Guerrini
Adauto Lucas da Silva
Walther Azzolini Júnior
صندلی اداری

Abstract

Currently, the activities of the planning and control of companies are becoming increasingly complex and the managers of this area are constantly pressured to reduce operating costs, maintain inventories at adequate levels, to fully meet the demand of customers, and to respond effectively to changes that occur. The planning and scheduling task is important for most companies, so according to some authors, there is a need for further analysis of the practical use of production planning and control systems. Within the context of production planning and control systems development, in the 1990s were launched the APS systems, which represent an innovation when compared to their predecessors. This paper intended to provide through a literature review, the concepts, structure, capabilities, implementation process and benefits of using APS systems in the companies production planning and control. The main contribution of this research is to show a strong conceptual understanding regarding APS systems, which can be used as a solid theoretical reference for future researches.

Downloads

Download data is not yet available.

Article Details

Section
Articles
Author Biographies

Thales Botelho de Sousa, Escola de Engenharia de São Carlos - Universidade de São Paulo

Departamento de Engenharia de Produção.

Carlos Eduardo Soares Camparotti, Escola de Engenharia de São Carlos - Universidade de São Paulo

Departamento de Engenharia de Produção.

References

AL-TAHAT, M. D.; BATAINEH, K. M. (2012) Statistical analyses and modeling of the implementation of agile manufacturing tactics in industrial firms. Mathematical Problems in Engineering, v. 2012, p. 1-23.

ARSOVSKI, S.; ARSOVSKI, Z.; MIROVIC, Z. (2009) The Integrating Role of Simulation in Modern Manufacturing Planning and Scheduling. Journal of Mechanical Engineering, v. 55, n. 1, p. 33-44.

BORTOLLOSSI, L. N.; SAMPAIO, M. (2012) A produção acadêmica publicada na revista Gestão & Produção de 1999 a 2010: tendências e direções para pesquisas futuras. Gestão & Produção, v. 19, n. 1, p. 189-201.

BOULAKSIL, Y.; FRANSOO, J. C.; HALM, E. N. G. V. (2009) Setting safety stocks in multi-stage inventory systems under rolling horizon mathematical programming models. OR Spectrum, v. 31, n. 1, p. 121-140.

BRANDENBURG, M.; TÖLLE, F-J. (2009) MILP-based campaign scheduling in a specialty chemicals plant: a case study. OR Spectrum, v. 31, n. 1, p. 141-166.

BRUN, A. et al. (2006) Value and risk assessment of supply chain management improvement projects. International Journal of Production Economics, v. 99, n. 1/2, p. 186-201.

CAPUTO, G.; GALLO, M.; GUIZZI, G. (2009) Optimization of production plan through simulation techniques. WSEAS Transactions on Information Science and Applications, v. 6, n. 3, p. 352-362.

CARNEVALLI, J. A.; MIGUEL, P. A. C. (2008) Review, analysis and classification of the literature on QFD - types of research, difficulties and benefits. International Journal of Production Economics, v. 114, n. 2, p. 737-754.

CHAMBERS, N. (1996) Beyond MRPII: a new approach to manufacturing planning and simulation. Industrial Management & Data Systems, v. 96, n. 4, p. 3-5.

CHEN, C. J. et al. (2013) Advanced planning and scheduling for TFT-LCD color filter fab with multiple lines. The International Journal of Advanced Manufacturing Technology, v. 67, n. 1/4, p. 101-110.

CHEN, W-L.; HUANG, C-Y.; LAI, Y-C. (2009) Multi-tier and multi-site collaborative production: illustrated by a case example of TFT-LCD manufacturing. Computers & Industrial Engineering, v. 57, n. 1, p. 61-72.

CHEN, K.; JI, P. (2007) A mixed integer programming model for advanced planning and scheduling (APS). European Journal of Operational Research, v. 181, n. 1, p. 515-522.

CHERN, C-C.; YANG, I-C. (2011) A heuristic master planning algorithm for supply chains that consider substitutions and commonalities. Expert Systems with Applications, v. 38, n. 12, p. 14918-14934.

CROXTON, K. L. et al. (2002) The demand management process. International Journal of Logistics Management, v. 13, n. 2, p. 51-66.

DAVID, F.; PIERREVAL, H.; CAUX, C. (2006) Advanced planning and scheduling systems in aluminium conversion industry. International Journal of Computer Integrated Manufacturing, v. 19, n. 7, p. 705-715.

DAYOU, L.; PU, Y.; JI, Y. (2009) Development of a multiobjective GA for advanced planning and scheduling problem. The International Journal of Advanced Manufacturing Technology, v. 42, n. 9/10, p. 974-992.

FERNANDES, F. C. F. et al. (2007) Identificação dos principais autores em planejamento e controle da produção por meio de um survey mundial com pesquisadores da área. Gestão & Produção, v. 14, n. 1, p. 83-95.

FORZA, C. (2002) Survey research in operations management: a process-based perspective. International Journal of Operations & Production Management, v. 22, n. 2, p. 152-194.

GARCIA-SABATER, J. P.; MAHEUT, J.; GARCIA-SABATER, J. J. (2012) A two-stage sequential planning scheme for integrated operations planning and scheduling system using MILP: the case of an engine assembler. Flexible Services and Manufacturing Journal, v. 24, n. 2, p. 171-209.

GEN, M.; LIN, L.; ZHANG, H. (2009) Evolutionary techniques for optimization problems in integrated manufacturing system: state-of-the-art-survey. Computers & Industrial Engineering, v. 56, n. 3, p. 779-808.

GIACON, E.; MESQUITA, M. A. (2011) Levantamento das práticas de programação detalhada da produção: um survey na indústria paulista. Gestão & Produção, v. 18, n. 3, p. 487-498.

GIL, A. C. (2008) Métodos e técnicas de pesquisa social. 6. ed. São Paulo: Atlas.

GÜNTHER, H-O.; MEYR, H. (2009) Supply chain planning and Advanced Planning Systems. OR Spectrum, v. 31, n. 1, p. 1-3.

HELBER, S. (1995) Lot sizing in capacitated production planning and control systems. OR Spektrum, v. 17, n. 1, p. 5-18.

HVOLBY, H-H.; STEGER-JENSEN, K. (2010) Technical and industrial issues of Advanced Planning and Scheduling (APS) systems. Computers in Industry, v. 61, n. 9, p. 845-851.

IVERT, L. K. (2012) Shop floor characteristics influencing the use of advanced planning and scheduling systems. Production Planning & Control, v. 23, n. 6, p. 452-467.

IVERT, L. K.; JONSSON, P. (2010) The potential benefits of advanced planning and scheduling systems in sales and operations planning. Industrial Management & Data Systems, v. 110, n. 5, p. 659-681.

IVERT, L. K.; JONSSON, P. (2011) Problems in the onward and upward phase of APS system implementation: why do they occur? International Journal of Physical Distribution & Logistics Management, v. 41, n. 4, p. 343-363.

JONSSON, P.; KJELLSDOTTER, L.; RUDBERG, M. (2007) Applying advanced planning systems for supply chain planning: three case studies. International Journal of Physical Distribution & Logistics Management, v. 37, n. 10, p. 816-834.

JUNG, H. (2012) An available-to-promise process considering production and transportation uncertainties and multiple performance measures. International Journal of Production Research, v. 50, n. 7, p. 1780-1798.

KANNEGIESSER, M.; GÜNTHER, H-O. (2011) An integrated optimization model for managing the global value chain of a chemical commodities manufacturer. Journal of the Operational Research Society, v. 62, n. 4, p. 711-721.

KRISTIANTO, Y.; AJMAL, M. M.; HELO, P. (2011) Advanced planning and scheduling with collaboration processes in agile supply and demand networks. Business Process Management Journal, v. 17, n. 1, p. 107-126.

KUNG, L-C.; CHERN, C-C. (2009) Heuristic factory planning algorithm for advanced planning and scheduling. Computers & Operations Research, v. 36, n. 9, p. 2513-2530.

LEE, Y. H.; JEONG, C. S.; MOON, C. (2002) Advanced planning and scheduling with outsourcing in manufacturing supply chain. Computers & Industrial Engineering, v. 43, n. 1/2, p. 351-374.

LUCZAK, H.; NICOLAI, H.; KEES, A. (1998) PPC-systems: Re-engineering or replacement? Venus: A fuzzy-decision-tool helps to evaluate outdated production planning and control systems. Production Planning & Control, v. 9, n. 5, p. 448-456.

MARIANO, E. B.; GUERRINI, F. M.; REBELATTO, D. A. N. (2012) Análise da relação entre estrutura e desempenho de redes interorganizacionais colaborativas. Gestão & Produção, v. 19, n. 3, p. 471-479.

MCKAY, K. N.; WIERS, V. C. S. (2003) Integrated decision support for planning, scheduling, and dispatching tasks in a focused factory. Computers in Industry, v. 50, n. 1, p. 5-14.

MEYR, H.; WAGNER, M.; ROHDE, J. (2005) Structure of Advanced Planning Systems. In: STADTLER, H.; KILGER, C. (Eds.). Supply Chain Management and Advanced Planning: concepts, models software and case studies. Third Edition. Heidelberg: Springer Berlin Heidelberg New York.

MUKHOPADHYAY, S. K.; DWIVEDY, J.; KUMAR, A. (1998) Design and implementation of an integrated production planning system for a pharmaceutical manufacturing concern in India. Production Planning & Control, v. 9, n. 4, p. 391-402.

MUSSELMAN, K.; O’REILLY, J.; DUKET, S. (2002) The role of simulation in Advanced Planning and Scheduling. In: WINTER SIMULATION CONFERENCE, 34. San Diego, 2002. Proceedings of the 2002 Winter Simulation Conference. San Diego: ACM.

NEUMANN, K.; SCHWINDT, C.; TRAUTMANN, N. (2002) Advanced production scheduling for batch plants in process industries. OR Spectrum, v. 24, n. 3, p. 251-279.

NGAI, E. W. T. et al. (2008) RFID research: an academic literature review (1995-2005) and future research directions. International Journal of Production Economics, v. 112, n. 1, p. 510-520.

NYHUIS, P.; WIENDAHL, H-P. (2004) 3-Sigma PPC - a holistic approach for managing the logistic performance of production systems. CIRP Annals - Manufacturing Technology, v. 53, n. 1, p. 371-376.

OMAR, M. K.; BENNELL, J. A. (2009) Revising the máster production Schedule in a HPP framework context. International Journal of Production Research, v. 47, n. 20, p. 5857-5878.

ÖZTÜRK, C.; ORNEK, A. M. (2014) Operational extended model formulations for Advanced Planning and Scheduling systems. Applied Mathematical Modelling, v. 38, n. 1, p. 181-195.

OU-YANG, C.; HON, S. J. (2008) Developing an agent-based APS and ERP collaboration framework. The International Journal of Advanced Manufacturing Technology, v. 35, n. 9/10, p. 943-967.

PACHECO, R. F.; CÂNDIDO, M. A. B. (2002) Uma metodologia para a seleção de sistemas de programação da produção com capacidade finita. In: ENCONTRO NACIONAL DE ENGENHARIA DE PRODUÇÃO, 22. Curitiba, 2002. Anais... Rio de Janeiro: ABEPRO.

PACHECO, R. F.; SANTORO, M. C. (2001) A Adoção de modelos de schedulingno Brasil: deficiências do processo de escolha. Gestão & Produção, v. 8, n. 2, p. 128-138.

PEDROSO, M. C.; CÔRREA, H. L. (1996) Sistemas de programação da produção com capacidade finita: uma decisão estratégica? Revista de Administração de Empresas, v. 36, n. 4, p. 60-73.

PENG, Y.; LU, D.; CHEN, Y. (2014) A Constraint Programming Method for Advanced Planning and Scheduling System with Multilevel Structured Products. Discrete Dynamics in Nature and Society, v. 2014, p. 1-7.

PORTER, J. K. et al. (1996) Production planning and control system developments in Germany. International Journal of Operations & Production Management, v. 16, n. 1, p. 27-39.

RODRIGUEZ, D. S. S.; COSTA, H. G.; DO CARMO, L. F. R. R. S. (2013) Métodos de auxílio multicritério à decisão aplicados a problemas de PCP: Mapeamento da produção em periódicos publicados no Brasil. Gestão & Produção, v. 20, n. 1, p. 134-146.

RUDBERG, M.; CEDERBORG, O. (2011) APS for tactical planning in a steel processing company. Industrial Management & Data Systems, v. 111, n. 4, p. 608-628.

RUDBERG, M.; THULIN, J. (2009) Centralised supply chain master planning employing advanced planning systems. Production Planning & Control, v. 20, n. 2, p. 158-167.

SAFAEI, A. S. et al. (2010) Integrated multi-site production-distribution planning in supply chain by hybrid modelling. International Journal of Production Research, v. 48, n. 14, p. 4043-4069.

SETIA, P.; SAMBAMURTHY, V.; CLOSS, D. J. (2008) Realizing business value of agile IT applications: antecedents in the supply chain networks. Information Technology and Management, v. 9, n. 1, p. 5-19.

STADTLER, H. (2005) Supply chain management and advanced planning - basics, overview and challenges. European Journal of Operational Research, v. 163, n. 3, p. 575-588.

STEGER-JENSEN, K. et al. (2011) Advanced Planning and Scheduling technology. Production Planning & Control, v. 22, n. 8, p. 800-808.

STEGER-JENSEN, K.; SVENSSON, C. (2004) Issues of mass customisation and supporting IT-solutions. Computers in Industry, v. 54, n. 1, p. 83-103.

TURRIONI, J. B.; MELLO, C. H. P. (2012) Metodologia de pesquisa em engenharia de produção: estratégias, métodos e técnicas para condução de pesquisas quantitativas e qualitativas. Apostila do curso de Especialização em Qualidade e Produtividade. Universidade Federal de Itajubá, Itajubá, MG.

VILLAS, M. V.; SOARES, T. D. L. V. A. M.; RUSSO, G. M. (2008) Bibliographical research method for business administration studies: a model based on scientific journal ranking. Brazilian Administration Review, v. 5, n. 2, p. 139-159.

VILLEGAS, F. A.; SMITH, N. R. (2006) Supply chain dynamics: analysis of inventory vs. order oscillations trade-off. International Journal of Production Research, v. 44, n. 6, p. 1037-1054.

WEZEL, W. V.; DONK, D. P. V.; GAALMAN, G. (2006) The planning flexibility bottleneck in food processing industries. Journal of Operations Management, v. 24, n. 3, p. 287-300.

WIENDAHL, H-H.; VON CIEMINSKI, G.; WIENDAHL, H-P. (2005) Stumbling blocks of PPC: Towards the holistic configuration of PPC systems. Production Planning & Control, v. 16, n. 7, p. 634-651.

WIERS, V. C. S. (2002) A case study on the integration of APS and ERP in a steel processing plant. Production Planning & Control, v. 13, n. 6, p. 552-560.

WIERS, V. C. S. (2009) The relationship between shop floor autonomy and APS implementation success: evidence from two cases. Production Planning & Control, v. 20, n. 7, p. 576-585.

ZHONG, R. Y. et al. (2013) RFID-enabled real-time advanced planning and scheduling shell for production decision making. International Journal of Computer Integrated Manufacturing, v. 26, n. 7, p. 649-662.

ZORYK-SCHALLA, A. J.; FRANSOO, J, C.; DE KOK, T. G. (2004) Modeling the planning process in advanced planning systems. Information & Management, v. 42, n. 1, p. 75-87.

فروشگاه اینترنتی