A detailed survey of just-in-time implementation status within Libyan cement industry, and its implication for operations management
Main Article Content
صندلی اداریAbstract
This paper investigates in detail the current status of the implementation levels of JIT key-factors and their sub-elements within the cement industry within Libya, and its implication for management within the said industry. A survey methodology has been applied in this detailed investigation using an intensive questionnaire and one-to-one interviews of the correspondent organizations. Based on the analysis of the survey findings, the results show that the implementation status of the JIT key-factors and their sub-elements are found to be in the modest levels across all the surveyed organisations, thereby indicating to opportunities for eliminating waste and improving the value chain. This paper has also pointed to crucial areas where the senior management body within this industry need to take immediate actions in order to achieve an effective and successful implementation of JIT systems. The paper also makes a contribution by providing an insight into what extent the JIT key-factors and their sub-elements are understood and implemented within the key Libyan manufacturing industry.
Downloads
Article Details
1. Proposal of Policy for Free Access Periodics
Authors whom publish in this magazine should agree to the following terms:
a. Authors should keep the copyrights and grant to the magazine the right of the first publication, with the work simultaneously permitted under the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 that allows the sharing of the work with recognition of the authorship of the work and initial publication in this magazine.
b. Authors should have authorization for assuming additional contracts separately, for non-exclusive distribution of the version of the work published in this magazine (e.g.: to publish in an institutional repository or as book chapter), with recognition of authorship and initial publication in this magazine.
c. Authors should have permission and should be stimulated to publish and to distribute its work online (e.g.: in institutional repositories or its personal page) to any point before or during the publishing process, since this can generate productive alterations, as well as increasing the impact and the citation of the published work (See The Effect of Free Access).
Proposal of Policy for Periodic that offer Postponed Free Access
Authors whom publish in this magazine should agree to the following terms:
a. Authors should keep the copyrights and grant to the magazine the right of the first publication, with the work simultaneously permitted under the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 [SPECIFY TIME HERE] after the publication, allowing the sharing of the work with recognition of the authorship of the work and initial publication in this magazine.
b. Authors should have authorization for assuming additional contracts separately, for non-exclusive distribution of the version of the work published in this magazine (e.g.: to publish in institutional repository or as book chapter), with recognition of authorship and initial publication in this magazine.
c. Authors should have permission and should be stimulated to publish and to distribute its work online (e.g.: in institutional repositories or its personal page) to any point before or during the publishing process, since this can generate productive alterations, as well as increasing the impact and the citation of the published work (See The Effect of Free Access).
d. They allow some kind of open dissemination. Authors can disseminate their articles in open access, but with specific conditions imposed by the editor that are related to:
Version of the article that can be deposited in the repository:
Pre-print: before being reviewed by pairs.
Post-print: once reviewed by pairs, which can be:
The version of the author that has been accepted for publication.
The editor's version, that is, the article published in the magazine.
At which point the article can be made accessible in an open manner: before it is published in the magazine, immediately afterwards or if a period of seizure is required, which can range from six months to several years.
Where to leave open: on the author's personal web page, only departmental websites, the repository of the institution, the file of the research funding agency, among others.
References
CALLEN, L.; ITZHAK, K. (2000) Just-In-Time: A Cross-Sectional Plant Analysis. International Journal of Production Economics, v. 63.
DONG, Y.; CARING; DRESNER, E. (2001) JIT Purchasing and Performance: An Exploratory Analysis Of Buyer And Supplier Perspectives. Journal of Operations Management, v. 19, p. 471-483.
FULLERTON, R.; MCWATTERS, (2001) The Production Performance Benefits From JIT Implementation. Journal of Operations Management, v. 19.
GARGEYA, T. (2002) Impact of JIT on Inventory to Sales Ratio, Journal of Industrial Management and Data Systems, v. 102, n. 4.
HENRY, C. (1998) The Human Factor in Advanced Manufacturing Technology Adoption, International Journal of Operations & Production Management, v. 18, n. 1.
HOKOMA, R.; AMAIGL, H. (2016) Manufacturing Resources Planning In Action: The Case of Cement Industry, proceedings of the sixth international conference on industrial engineering and operations management, (IEOM2016), Malaysia.
HOKOMA, R. (2016) A Survey Investigation of Just-In-Time Implementation and Its Implications for Management in Four key Industries within Libya, International Journal of Engineering Research & Technology, v. 5, n. 12.
HOKOMA, R. (2016) A Way Forward For Implementing Just-In-Time Techniques Within Oil & Gas Industries: Domestic Appliances, Journal of Engineering Research, Faculty of Engineering, University of Tripoli, n. 21, Tripoli, Libya.
HOKOMA, R.; BINDRA, S.; MANSOR, E. (2008) Textile Industry in North Africa Region: A Case of Total Quality Management (TQM) Within The Libyan Textile Industry, Proceeding of the quality conference 2008, Tripoli, Libya
HOKOMA, R.; KHAN, K.; HUSSAIN, K. (2006) The Current Status of MRPII Implementation in Some Key Manufacturing Industries within Libya: A Survey Investigation, Proceedings of the 22nd international conference, Narosa Publishing House, New Delhi.
LAI, C.; LEE, W.; IP, W. H. (2003) A Study of System Dynamics in Just-in-Time Logistics, Journal of Materials Processing Technology, v. 138, n. 1.
LI-HSING; WEI-FENG; (2013) Applying a Just-In-Time Integrated Supply Chain Model With Inventory and Waste Reduction Considerations, American Journal of Applied Sciences, v. 10, n. 7, p. 751-759.
ORAL, E.; ERDIS, E. (2003) JIT in Developing Countries-a Case Study of the Turkish Prefabrication Sector, Building and Environment, v. 38, n. 6.
PALLANT, J. (2005) SPSS Survival Manual. UK: McGraw-Hill Education, Open University Press.
POLAT, A. (2005) The JIT Materials Management System in Developing Countries, Construction Management and Economics, v. 23, p. 697-712.
RIFAI, A.; HOKOMA, R.; ESBIGA, M.; HALA, M. (2006) The Strategy Applied Towards Implementing JIT and MRPII Planning and Control Techniques within Libyan Construction and Cement Industries, Proceedings of the international conference on technology management, Kuala Lumpur, Malaysia.
TUGHAR, M.; RIFAI, A.; EDAAYF, R.; HOKOMA, R. (2007) Management of Energy and Water Saving For Concrete Structures in Coastal States, Proceeding of first international conference and exhibition on environmental impact of energy and water saving in tourism industry, International Energy Foundation, Tripoli, Libya.
YASUTAKA, (2013) A Large-Scale Empirical Study of Just-in-Time Quality Assurance, IEEE Transactions on Software Engineering, v. 39, n. 6. p. 757-773.